back to Multiply Home View Movie
choose Multiply Underlayment
About Multiply Home | Product | Installation | Warranty | FAQ | Contact

Installation Guide

Preparation Underlayment and Subfloor

Tools for the job
Material for the job
People for the job
Acclimation
Subfloor
Crawl spaces
Over existing vinyl floors

Installation Vinyl Sheet & Tile

Setting the first panel
Fastening all other panels
Patching
Sanding
Final check
Installing the new vinyl floor covering
Avoid Going Wrong

Installation Ceramic Tile

Material
Subfloor
Setting the first panel
Fastening all other panels
Installation - mortar
Installation - setting tile

View installation video


Installation Guide and Warranty
English (PDF)
Guide de pose et garantie

French (PDF)
Guía de instalación y garantía
Spanish (PDF)

Get Adobe Reader

Preparation - Underlayment and Subfloor
 

TOOLS FOR THE JOB

Tools found in the Professional Installer’s toolbox:

  1. Belt sander or commercial floor sander – complete with dust bags.
  2. Pneumatic powered Narrow Crown Stapler and air compressor or manual mallet-actuated stapler. Alternatively, an electric screwdriver or claw hammer, depending on the fastener used.
  3. Heavy-duty utility knife or electric trim saw to cut panels.
  4. Vacuum cleaner and broom.
  5. Measuring tape and carpenter’s pencil.
  6. Moisture meter – especially important when installing in new construction and over crawl spaces.


Home | Product | Installation | Warranty | FAQ | Contact | Entrance
multiplyplywood.com
Copyright © 2001-2005 All rights reserved - Web design by Voras