back to Multiply Home View Movie
choose Multiply Underlayment
About Multiply Home | Product | Installation | Warranty | FAQ | Contact

Installation Guide

Preparation Underlayment and Subfloor

Tools for the job
Material for the job
People for the job
Acclimation
Subfloor
Crawl spaces
Over existing vinyl floors

Installation Vinyl Sheet & Tile

Setting the first panel
Fastening all other panels
Patching
Sanding
Final check
Installing the new vinyl floor covering
Avoid Going Wrong

Installation Ceramic Tile

Material
Subfloor
Setting the first panel
Fastening all other panels
Installation - mortar
Installation - setting tile

View installation video


Installation Guide and Warranty
English (PDF)
Guide de pose et garantie

French (PDF)
Guía de instalación y garantía
Spanish (PDF)

Get Adobe Reader

 

 

 

 

 

 

Installation Vinyl Sheet & Tile

SANDING

  • Sand all seams. Leveling seam surfaces between all panel edges is critical to help avoid seam telegraphing.

  • Use either an electric belt sander or commercial floor sander and begin with 80 to 100 grit sandpaper and finish with 120 grit sandpaper.

  • Sand all seams at a 45º angle approximately 8” in from the edges. Check along all seams for faded X’s to assure every edge has been sanded.

  • Avoid over sanding and avoid dishing or cupping of surfaces.

  • Hand sanding is not sufficient.

  • Sweep and vacuum all dust and debris thoroughly.

WARNING: Wood dust can cause eye and breathing problems. Always place safety first and wear a dust mask and safety glasses or eye goggles.


Home | Product | Installation | Warranty | FAQ | Contact | Entrance
multiplyplywood.com
Copyright © 2001-2005 All rights reserved - Web design by Voras