back to Multiply Home View Movie
choose Multiply Underlayment
About Multiply Home | Product | Installation | Warranty | FAQ | Contact

Installation Guide

Preparation Underlayment and Subfloor

Tools for the job
Material for the job
People for the job
Acclimation
Subfloor
Crawl spaces
Over existing vinyl floors

Installation Vinyl Sheet & Tile

Setting the first panel
Fastening all other panels
Patching
Sanding
Final check
Installing the new vinyl floor covering
Avoid Going Wrong

Installation Ceramic Tile

Material
Subfloor
Setting the first panel
Fastening all other panels
Installation - mortar
Installation - setting tile

View installation video


Installation Guide and Warranty
English (PDF)
Guide de pose et garantie

French (PDF)
Guía de instalación y garantía
Spanish (PDF)

Get Adobe Reader

 

 

 

 

 

 

Installation Vinyl Sheet & Tile

INSTALLING THE NEW VINYL FLOOR COVERING

Proceed with the installation carefully following instructions provided by the vinyl flooring manufacturer and adhesive manufacturer.

  • Use a properly notched and maintained trowel and apply sufficient adhesive as directed. Too much adhesive may cause bubbles to appear or panels to swell.

  • Do NOT leave adhesive open too long since its performance could be reduced.

  • Roll the new vinyl flooring with a 100-pound roller in both directions to establish a firm contact between the vinyl floor covering and underlayment.

  • Keep traffic and furniture movement off the floor for 24 hours or until the adhesive has fully bonded.

  • HINT: Use a MULTIPLY panel to protect the new floor while sliding heavy appliances into place.


Home | Product | Installation | Warranty | FAQ | Contact | Entrance
multiplyplywood.com
Copyright © 2001-2005 All rights reserved - Web design by Voras