back to Multiply Home View Movie
choose Multiply Underlayment
About Multiply Home | Product | Installation | Warranty | FAQ | Contact

Installation Guide

Preparation Underlayment and Subfloor

Tools for the job
Material for the job
People for the job
Acclimation
Subfloor
Crawl spaces
Over existing vinyl floors

Installation Vinyl Sheet & Tile

Setting the first panel
Fastening all other panels
Patching
Sanding
Final check
Installing the new vinyl floor covering
Avoid Going Wrong

Installation Ceramic Tile

Material
Subfloor
Setting the first panel
Fastening all other panels
Installation - mortar
Installation - setting tile

View installation video


Installation Guide and Warranty
English (PDF)
Guide de pose et garantie

French (PDF)
Guía de instalación y garantía
Spanish (PDF)

Get Adobe Reader

 

 

 

 

 

 

Installation - Ceramic Tile

SETTING THE FIRST PANEL

  • Choose a corner along a straight long line and begin to install and fasten one panel at a time.

  • Install all panels with the grain set at right angles to the floor joists.

  • Offset panel edge from the subfloor edges by a minimum of 12” – all panels.

  • Leave a 1/8" wide space between panels and 1/4" wide space between panels and any restraining surface which they abut, such as columns or perimeter walls, to allow for expansion.
Note

Tile must not be installed on Multiply underlayment with epoxy or modified epoxy emulsion mortar unless it is installed with 1/4" gaps between panels

  • Start from a panel corner and fasten row by row to the opposite side. Do NOT four-corner fasten first.

  • Use full body weight over the area being fastened to assure firm contact with the subfloor.

  • Fasten panels every 2” along the edges and 4” across the field, on every X.

  • Position fasteners 3/8” to 1/2” in from panel edges.


Home | Product | Installation | Warranty | FAQ | Contact | Entrance
multiplyplywood.com
Copyright © 2001-2005 All rights reserved - Web design by Voras